Close Menu
FlyMarshallFlyMarshall
  • Aviation
    • AeroTime
    • Airways Magazine
    • Simple Flying
  • Corporate
    • AINonline
    • Corporate Jet Investor
  • Cargo
    • Air Cargo News
    • Cargo Facts
  • Military
    • The Aviationist
  • Defense
  • OEMs
    • Airbus RSS Directory
  • Regulators
    • EASA
    • USAF RSS Directory
What's Hot

Boeing secures Biman Bangladesh order for 787 Dreamliners and 737 MAX jets

May 1, 2026

What Role Do Jet Streams Play in Aviation?

May 1, 2026

Transfer Chase Points To Air France-KLM Flying Blue With 20% Bonus: Worth It?

May 1, 2026
Facebook X (Twitter) Instagram
Demo
  • Aviation
    • AeroTime
    • Airways Magazine
    • Simple Flying
  • Corporate
    • AINonline
    • Corporate Jet Investor
  • Cargo
    • Air Cargo News
    • Cargo Facts
  • Military
    • The Aviationist
  • Defense
  • OEMs
    • Airbus RSS Directory
  • Regulators
    • EASA
    • USAF RSS Directory
Facebook X (Twitter) Instagram
Demo
Home » Airbus CEO optimistic about A220 despite engine frustration with Pratt & Whitney
AeroTime

Airbus CEO optimistic about A220 despite engine frustration with Pratt & Whitney

FlyMarshall NewsroomBy FlyMarshall NewsroomFebruary 19, 2026No Comments2 Mins Read
Share
Facebook Twitter LinkedIn Pinterest Email

Airbus sees 2026 as a year to ramp up production while also playing a leading role in Europe’s efforts to strengthen its defense sovereignty, stated the company’s CEO, Guillaume Faury, during a press conference in Toulouse on February 19, 2026. 

On the commercial side, Airbus is moving ahead with the A320 family replacement, which was previously announced for 2025.  

Faury noted that there are several important design choices to be made by the end of this decade. Perhaps the most important is the type of propulsion, with both open rotor and ducted fan considered. The final choice will determine the aircraft’s architecture.  

Faury also explained that each option has its own pros and cons, and Airbus is in talks with all engine manufacturers on this matter, although he singled out CFM as a potential partner for the open rotor concept, which is seen as a somewhat more modern option. However, he added that nothing has been decided yet because all the program participants are currently at the data collection stage.  

Asked whether Airbus’ current strong position in the single-aisle market disincentivized the development of new platforms, Faury acknowledged the need to continue improving the current single-aisle products but noted that it is normal to have some major new developments every 20-25 years.  

He reiterated that the successor to the A320 family will be a significant step change from current platforms and will deliver fuel burn savings of 25-30% compared with similarly sized aircraft of the current generation. 

Faury also attributed Boeing’s recent success in catching up in terms of order numbers, in part to Airbus’ own success. Since Airbus’ order book grew to a point in which the gap between orders and production, any new prospective buyers faced relatively long lead times for delivery.  

In response to journalists’ questions about the extent to which a more commercially assertive US administration may have contributed to Boeing’s recent order surge, Faury stated that companies like Airbus have to factor this in. He also reiterated that the European planemaker’s products remain very competitive on the global stage.  

Addressing the Pratt & Whitney engine dispute

Faury did not hide his disappointment with the way Pratt & Whitney has handled ongoing issues with A220 engines, stating that the engine maker had not respected Airbus’ contractual rights. This, he said, is a matter that needed to be addressed, but did not elaborate any further.  

According to Faury, the problem is that, faced with the multiple challenges of serving new production aircraft and addressing the recall of a number of engines found to have metallurgical defects, the engine maker had prioritized the latter. Faury said he believed the company should have made a greater effort to address both in parallel.  

Faury also reiterated that the A220 delivery guidance offered alongside the 2025 Full-Year Financial Results reflects the outcome of the latest conversations with P&W and the delivery targets the engine maker said it could achieve in 2026. Airbus is working closely with P&W to make sure that at least the originally agreed 2027 volumes are met.  

In any case, demand for the A220 is there; the program is making progress, and Faury said Airbus is comfortable that it will continue to receive orders to sustain its expected production rates.

source

FlyMarshall Newsroom
  • Website

Related Posts

Boeing secures Biman Bangladesh order for 787 Dreamliners and 737 MAX jets

May 1, 2026

‘No country left behind.’ Exclusive interview with ICAO Deputy Head Miguel Marín

May 1, 2026

British Aviation Group: the power of collaboration is alive and kicking

May 1, 2026

Despite stronger Q1 2026 revenue, JetBlue remains deep in the red

May 1, 2026
Add A Comment
Leave A Reply Cancel Reply

Latest Posts

Boeing secures Biman Bangladesh order for 787 Dreamliners and 737 MAX jets

May 1, 2026

What Role Do Jet Streams Play in Aviation?

May 1, 2026

Transfer Chase Points To Air France-KLM Flying Blue With 20% Bonus: Worth It?

May 1, 2026

Transfer Capital One Miles To Qantas With 20% Bonus: Worth It?

May 1, 2026

Subscribe to Updates

Please enable JavaScript in your browser to complete this form.
Loading
About Us

Welcome to FlyMarshall — where information meets altitude. We believe aviation isn’t just about aircraft and routes; it’s about stories in flight, innovations that propel us forward, and the people who make the skies safer, smarter, and more connected.

 

Useful Links
  • Business / Corporate Aviation
  • Cargo
  • Commercial Aviation
  • Defense News (Air)
  • Military / Defense Aviation
Quick Links
  • About Us
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms and Conditions

Subscribe to Updates

Please enable JavaScript in your browser to complete this form.
Loading
Copyright © 2026 Flymarshall.All Right Reserved
  • About Us
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version