Close Menu
FlyMarshallFlyMarshall
  • Aviation
    • AeroTime
    • Airways Magazine
    • Simple Flying
  • Corporate
    • AINonline
    • Corporate Jet Investor
  • Cargo
    • Air Cargo News
    • Cargo Facts
  • Military
    • The Aviationist
  • Defense
  • OEMs
    • Airbus RSS Directory
  • Regulators
    • EASA
    • USAF RSS Directory
What's Hot

Singapore Airlines selects Starlink for Airbus A380 and A350 passengers

May 5, 2026

NATO nations size up an interceptor-drone bazaar where low price is everything

May 5, 2026

British Airways Cuts Business Class Headrest Covers With Lame Logic

May 5, 2026
Facebook X (Twitter) Instagram
Demo
  • Aviation
    • AeroTime
    • Airways Magazine
    • Simple Flying
  • Corporate
    • AINonline
    • Corporate Jet Investor
  • Cargo
    • Air Cargo News
    • Cargo Facts
  • Military
    • The Aviationist
  • Defense
  • OEMs
    • Airbus RSS Directory
  • Regulators
    • EASA
    • USAF RSS Directory
Facebook X (Twitter) Instagram
Demo
Home » Lockheed Martin expects F-35 tech upgrades to last through 2032
Defense News (Air)

Lockheed Martin expects F-35 tech upgrades to last through 2032

FlyMarshall NewsroomBy FlyMarshall NewsroomSeptember 19, 2025No Comments2 Mins Read
Share
Facebook Twitter LinkedIn Pinterest Email

LONDON — After encountering delays in the F-35 upgrade known as Technology Refresh 3, or TR-3, the jet’s producer Lockheed Martin expects to complete its Block 4 modernizations by 2032 at the latest, according to senior company representatives.

“TR-3 is a new foundation to move forward Block 4 integration that started in 2018 and will continue until 2030 or 2032, so for another five to seven years,” Jim Post, the director of the manufacturer’s F-35 Partner Customer Program, told Defense News at the 2025 DSEI UK show in London.

The F-35’s hardware and software upgrade effort, known as Block 4, is designed to boost the fighter jet’s weapons capabilities, sensors and sensor fusion. As of September 2025, it was at least $6 billion over budget and years behind schedule, which was partly due to delays with the implementation of TR-3.

“Block 4 means the aircraft’s evolution, and TR-3 makes the F-35 as much as 25 times faster. It gives the jet’s systems a much improved memory, and its tactical displays for pilots are capable of implementing all processes at a faster speed,” Post said.

As the F-35 Joint Strike Fighter program is struggling with cost overruns, manufacturing delays and supply chain bottlenecks, the U.S. Government Accountability Office said in a Sept. 3 statement the “program plans to reduce the scope of Block 4 to deliver capabilities to the warfighter at a more predictable pace than in the past.”

The delayed TR-3 which is critical to the Block 4 modernization effort “was the primary driver of late aircraft deliveries in 2024,” according to the GAO. Last year, Lockheed Martin “delivered 110 aircraft. All were late by an average of 238 days, up from 61 days in 2023.”

Under the plan, dedicated operational tests for the TR-3 upgrades are to begin in the U.S. in mid to late fiscal 2026, allowing to verify if the technology refresh is operationally effective.

Editor’s note: The story has been updated to clarify Lockheed Martin expects the Block 4 modernizations to be done by 2032.

Jaroslaw Adamowski is the Poland correspondent for Defense News.

source

FlyMarshall Newsroom
  • Website

Related Posts

NATO nations size up an interceptor-drone bazaar where low price is everything

May 5, 2026

Ukraine could lift arms-exports ban this year as would-be buyers line up

May 5, 2026

US, Iran launch new attacks as they wrestle for control of Gulf waters

May 5, 2026

German defense minister laments long-range strike ‘gap’ caused by planned US drawdown

May 5, 2026
Add A Comment
Leave A Reply Cancel Reply

Latest Posts

Singapore Airlines selects Starlink for Airbus A380 and A350 passengers

May 5, 2026

NATO nations size up an interceptor-drone bazaar where low price is everything

May 5, 2026

British Airways Cuts Business Class Headrest Covers With Lame Logic

May 5, 2026

Israel’s first KC-46 ‘Gideon’ tanker completes maiden flight in US skies

May 5, 2026

Subscribe to Updates

Please enable JavaScript in your browser to complete this form.
Loading
About Us

Welcome to FlyMarshall — where information meets altitude. We believe aviation isn’t just about aircraft and routes; it’s about stories in flight, innovations that propel us forward, and the people who make the skies safer, smarter, and more connected.

 

Useful Links
  • Business / Corporate Aviation
  • Cargo
  • Commercial Aviation
  • Defense News (Air)
  • Military / Defense Aviation
Quick Links
  • About Us
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms and Conditions

Subscribe to Updates

Please enable JavaScript in your browser to complete this form.
Loading
Copyright © 2026 Flymarshall.All Right Reserved
  • About Us
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version