Close Menu
FlyMarshallFlyMarshall
  • Aviation
    • AeroTime
    • Airways Magazine
    • Simple Flying
  • Corporate
    • AINonline
    • Corporate Jet Investor
  • Cargo
    • Air Cargo News
    • Cargo Facts
  • Military
    • The Aviationist
  • Defense
  • OEMs
    • Airbus RSS Directory
  • Regulators
    • EASA
    • USAF RSS Directory
What's Hot

Kazakhstan’s SCAT Airlines orders 5 more Boeing 737-9 jets, converts 5 737-8s 

April 29, 2026

Turkish Airlines suspends 18 destinations amid rising geopolitical tensions

April 29, 2026

British Airways Adds Restrictions To Taking Photos & Videos Onboard Flights

April 29, 2026
Facebook X (Twitter) Instagram
Demo
  • Aviation
    • AeroTime
    • Airways Magazine
    • Simple Flying
  • Corporate
    • AINonline
    • Corporate Jet Investor
  • Cargo
    • Air Cargo News
    • Cargo Facts
  • Military
    • The Aviationist
  • Defense
  • OEMs
    • Airbus RSS Directory
  • Regulators
    • EASA
    • USAF RSS Directory
Facebook X (Twitter) Instagram
Demo
Home » FAA to require 25-hour cockpit voice recorders on new aircraft
AeroTime

FAA to require 25-hour cockpit voice recorders on new aircraft

FlyMarshall NewsroomBy FlyMarshall NewsroomFebruary 1, 2026No Comments2 Mins Read
Share
Facebook Twitter LinkedIn Pinterest Email

The US Federal Aviation Administration has finalized a rule that will expand cockpit voice recorder (CVR) retention from the long-standing two-hour loop to 25 hours, a major shift intended to stop crucial audio from being overwritten before investigators can secure it.

For newly produced passenger aircraft, the requirement is set to take effect from 2027, making 25-hour CVRs the new baseline on fresh deliveries rather than an optional upgrade.

The FAA argues that two hours is increasingly misaligned with how incidents are reported and handled in real life, especially when an event is noticed late, when a flight continues through taxi-in and turnaround, or when crews operate additional sectors before anyone recognizes the need to preserve recordings.

The practical impact for investigations is straightforward: more timeline, more context. A 25-hour window can capture decision-making and workload well before the peak moment, plus the actions and communications after an event, which can be critical to understanding causal chains and human factors. The rule is also meant to reduce the growing number of cases where CVR audio is unavailable simply because it was overwritten.

Retrofit cost and privacy concerns

The move, however, comes with familiar pushback. Pilot unions and labor groups have long treated cockpit audio as uniquely sensitive, and a larger recording window amplifies concerns about misuse, access control, and chilling effects on cockpit communication. The FAA points to existing safeguards intended to keep CVR audio tied to safety investigations, but the privacy debate is unlikely to disappear, particularly when handling practices can vary once recorders are back in operator hands.

Cost is another fault line, especially around retrofit. For new-build aircraft, the incremental cost of installing a 25-hour CVR instead of a two-hour unit is generally considered limited. Retrofitting older aircraft is more complicated and expensive, depending on hardware, installation labor, and integration, and the FAA has been cautious about imposing a blanket fleetwide retrofit through regulation alone. Still, retrofit timelines are in place under separate legislative requirements for certain “covered” aircraft and operators, creating a longer runway toward compliance across the in-service fleet.

International alignment is part of the rationale. ICAO and European regulators have already moved toward 25-hour CVRs for new aircraft, and the FAA’s rule brings the US closer to that direction, reducing divergence among global manufacturers and operators.

source

FlyMarshall Newsroom
  • Website

Related Posts

Kazakhstan’s SCAT Airlines orders 5 more Boeing 737-9 jets, converts 5 737-8s 

April 29, 2026

Turkish Airlines suspends 18 destinations amid rising geopolitical tensions

April 29, 2026

Lockheed Martin to provide E-130J Phoenix II training systems

April 29, 2026

Rolls-Royce, easyJet successfully conduct engine test using 100% hydrogen fuel

April 29, 2026
Add A Comment
Leave A Reply Cancel Reply

Latest Posts

Kazakhstan’s SCAT Airlines orders 5 more Boeing 737-9 jets, converts 5 737-8s 

April 29, 2026

Turkish Airlines suspends 18 destinations amid rising geopolitical tensions

April 29, 2026

British Airways Adds Restrictions To Taking Photos & Videos Onboard Flights

April 29, 2026

Lockheed Martin to provide E-130J Phoenix II training systems

April 29, 2026

Subscribe to Updates

Please enable JavaScript in your browser to complete this form.
Loading
About Us

Welcome to FlyMarshall — where information meets altitude. We believe aviation isn’t just about aircraft and routes; it’s about stories in flight, innovations that propel us forward, and the people who make the skies safer, smarter, and more connected.

 

Useful Links
  • Business / Corporate Aviation
  • Cargo
  • Commercial Aviation
  • Defense News (Air)
  • Military / Defense Aviation
Quick Links
  • About Us
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms and Conditions

Subscribe to Updates

Please enable JavaScript in your browser to complete this form.
Loading
Copyright © 2026 Flymarshall.All Right Reserved
  • About Us
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version