Close Menu
FlyMarshallFlyMarshall
  • Aviation
    • AeroTime
    • Airways Magazine
    • Simple Flying
  • Corporate
    • AINonline
    • Corporate Jet Investor
  • Cargo
    • Air Cargo News
    • Cargo Facts
  • Military
    • The Aviationist
  • Defense
  • OEMs
    • Airbus RSS Directory
  • Regulators
    • EASA
    • USAF RSS Directory
What's Hot

Unverified images from Iran show apparent debris of USAF F-15E 

April 3, 2026

United Increases Checked Bag Fees By $10-50, Blames Higher Fuel Costs

April 3, 2026

Airlines face a fuel hedging reckoning as Iran conflict reshapes flying costs

April 3, 2026
Facebook X (Twitter) Instagram
Demo
  • Aviation
    • AeroTime
    • Airways Magazine
    • Simple Flying
  • Corporate
    • AINonline
    • Corporate Jet Investor
  • Cargo
    • Air Cargo News
    • Cargo Facts
  • Military
    • The Aviationist
  • Defense
  • OEMs
    • Airbus RSS Directory
  • Regulators
    • EASA
    • USAF RSS Directory
Facebook X (Twitter) Instagram
Demo
Home » Boeing Finally Gets FAA Approval To Raise 737 MAX Production
Simple Flying

Boeing Finally Gets FAA Approval To Raise 737 MAX Production

FlyMarshall NewsroomBy FlyMarshall NewsroomOctober 18, 2025No Comments4 Mins Read
Share
Facebook Twitter LinkedIn Pinterest Email

Boeing has reportedly received approval from the United States Federal Aviation Administration (FAA) to increase production of the 737 MAX. According to a report by The Seattle Times, the American aircraft manufacturer will now be able to produce up to 42 jets per month.

Previously, production of the Boeing 737 MAX was capped at 38 units per month by the FAA. The limit was introduced in early 2024 following an incident involving an Alaska Airlines Boeing 737 MAX 9, during which a door panel blew out mid-flight, revealing quality lapses at Boeing.

Restoring Control In Its Manufacturing Processes

Boeing 737 MAX 10 aircraft taxiing in company colors at Paine Field factory Credit: Shutterstock

The news about the 737 MAX production rate increase suggests that the FAA believes Boeing has made significant improvements to its safety and manufacturing practices following the January 2024 737 MAX 9 incident, during which a door panel blew out mid-flight. The planned ramp-up is also viewed as a sign that Boeing’s management is regaining control over its internal processes, a step that could help the company strengthen its financial position as well.

According to a report by Reuters, FAA Administrator Bryan Bedford called Boeing chief executive officer (CEO) Kelly Ortberg on October 17, 2025, to confirm that the company could increase production to 42 aircraft per month, a source familiar with the matter said. The FAA added that its direct oversight of Boeing will remain unchanged. In a statement seen by The Seattle Times, the FAA said:

“FAA safety inspectors conducted extensive reviews of Boeing’s production lines to ensure that this small production rate increase will be done safely.”

Carefully Scaling Up Production

American Airlines Boeing 737-8 MAX N335SN at Curacao Hato International Airport (CUR), Credit: Shutterstock

The American plane maker is taking a cautious approach to increasing production of the Boeing 737 MAX. According to The Seattle Times, Boeing’s CEO Kelly Ortberg told analysts that the company plans to raise output in steps of five aircraft at a time, with each increase subject to a safety and quality review by the FAA.

Boeing has produced 450 737 MAX aircraft per year, based on its monthly rate of 38 jets. This remains below the company’s target of 50 per month, or roughly 600 aircraft annually. If the new rate of 42 jets per month is maintained throughout the year, Boeing would produce approximately 504 737 MAX aircraft each year.

However, Ortberg reportedly noted that the company anticipates roughly six months between each production rate increase. In fact, earlier media reports indicated that workers at Boeing’s Seattle-area factories have been preparing for the higher 737 production rate by installing additional equipment to boost capacity. According to Bloomberg, Boeing is preparing to ramp up production again in April and once more toward the end of 2026. Combined, these planned increases could raise monthly output to around 53 aircraft by the end of next year, according to the report.

737 MAX 7 & 10 Certification Delayed Until 2026

A Boeing 737 MAX parked in Renton Credit: Shutterstock

The vast majority of the global 737 MAX 8 and MAX 9 fleet has been in service since their debut in 2017 and 2018, respectively, except during the worldwide groundings that followed after the Lion Air and Ethiopian Airlines crashes, which were linked to the faulty MCAS system. The current certification issues pertain to the shortest-cabin Boeing 737 MAX 7 and stretched Boeing 737 MAX 10.

According to the latest updates, the certification of Boeing’s 737 MAX 7 and MAX 10 has been delayed, with the earliest expected timeline for approval being 2026, primarily due to complications with a redesign of the aircraft’s engine anti-ice system.

There is a long line of airlines around the world awaiting the arrival of the Boeing 737 MAX 10, especially as it is highly anticipated to improve operations and reduce costs at the highest-density hubs. Five airlines have each ordered over 100 of the MAX 10, including United Airlines, Ryanair, American Airlines, Delta Air Lines, Akasa, and Pegasus. Others have ordered around 50 each, like Alaska Airlines, Lion Air, Air India Express, and WestJet.

source

FlyMarshall Newsroom
  • Website

Related Posts

How Cabin Crew Rest & Sleep On The Airbus A380

January 1, 2026

Cabin Odor Prompts Delta Air Lines Boeing 737-900ER Diversion To Atlanta

January 1, 2026

The Aircraft Set To Replace One Most Versatile Narrowbody Aircraft In The World

January 1, 2026

Air Vs Airlines Vs Airways: What's The Difference?

January 1, 2026
Add A Comment
Leave A Reply Cancel Reply

Latest Posts

Unverified images from Iran show apparent debris of USAF F-15E 

April 3, 2026

United Increases Checked Bag Fees By $10-50, Blames Higher Fuel Costs

April 3, 2026

Airlines face a fuel hedging reckoning as Iran conflict reshapes flying costs

April 3, 2026

Bjorn’s Corner: Blended Wing Body Airliners. Part 4

April 3, 2026

Subscribe to Updates

Please enable JavaScript in your browser to complete this form.
Loading
About Us

Welcome to FlyMarshall — where information meets altitude. We believe aviation isn’t just about aircraft and routes; it’s about stories in flight, innovations that propel us forward, and the people who make the skies safer, smarter, and more connected.

 

Useful Links
  • Business / Corporate Aviation
  • Cargo
  • Commercial Aviation
  • Defense News (Air)
  • Military / Defense Aviation
Quick Links
  • About Us
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms and Conditions

Subscribe to Updates

Please enable JavaScript in your browser to complete this form.
Loading
Copyright © 2026 Flymarshall.All Right Reserved
  • About Us
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version